Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Shanghai Dark Horse Household Booster Pump Repair Specialty

Shanghai Grundfos Booster Pump Repair Shanghai Wilo Booster Pump Repair Shang...

sell
  • There is no classification
contact
  • Contact:周师傅
  • Phone:021-62524373
search
 
link
  • There is no link yet
home > sell > If you want to replace the German Velox booster pump repair in Pudong District, Shanghai, call 62524373
If you want to replace the German Velox booster pump repair in Pudong District, Shanghai, call 62524373
products: Views:11If you want to replace the German Velox booster pump repair in Pudong District, Shanghai, call 62524373 
price: 面议
MOQ:
Total supply:
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2015-04-25 14:01
 
Details
In Pudong District, Shanghai, I want to change the German Wilox booster pump repair phone number
Shanghai Dedong Hardware Pump Industry Sales Center specializes in selling household booster water pumps and industrial water pumps
This center has now introduced a new type of Wilox Circulation silent booster pump is mainly suitable for [hot water heating system, industrial circulation system (gas boiler, air conditioning and refrigeration cycle system, solar water heater system, tap water pressure is insufficient, water tower pressurization, household water heater water pressure is insufficient (improving hot and cold)). Its characteristics [Ultra-low noise, the sound intensity level of the water pump noise is lower than the limit value principle in the "Mechanical Equipment Standard", no oil seal, long service life, simple maintenance.
This product has the same characteristics as the Danish Grundfos booster pump Features and advantages There are more models for customers to choose from, such as Velox, etc.
This center is equipped with professional technicians for installation, maintenance and after-sales service. They have strong service awareness and professional knowledge and sincerely solve problems for customers.
Product delivery information
1. Make an appointment by phone for door-to-door delivery and installation. We will meet with the user to agree on an approximate installation time. In order to facilitate the customer's installation, we will bring the booster pump of the model ordered by the customer. Customers do not need to come to our company. Purchase. In order to ensure timely installation.
2. Within the outer ring road of this city, the installation fee of RMB is exempted. The material fee is collected according to the price list. In order to ensure the installation quality and the waste that may be caused by the user's own purchase, pipe fittings materials It is uniformly distributed by the company. (Users make reservations for installation and must indicate the need for piping materials)
3. The piping for installing the water pump must be within centimeters (installation labor fees are waived, and material fees are charged according to the price list). If the installation length exceeds Ancillary facilities, cutting hinges of extra-long pipelines, etc. are not included in the scope of free installation.
4. In principle, the installation location is installed according to the customer's requirements. In special circumstances, the customer must follow the correct requirements of the installer for installation.
/> 5. If the valve cannot be closed due to corrosion or the screw thread of the water meter is damaged, the valve or water meter needs to be replaced. The company will charge a labor fee for each unit.
6. Special circumstances not covered by this installation instruction, such as blocked pipes and showers Users who do not have the installation conditions should follow the staff's explanation. If the installation conditions are met, the user will receive satisfactory service. Otherwise, the company has the right to cancel the user's free installation service, and the company will not be responsible for the consequences. Responsibility.
7. After the installation is completed, the user's signature will be used as the certificate of approval. If it is re-modified, additional labor and material fees will be charged as installation fees. 8. The material charging price is calculated based on the actual price required on site. Contact us by phone. Master Renzhou
Mobile phone
Request for quotation
A total of0articles  Related Comments: